Please use this identifier to cite or link to this item:
http://ir.futminna.edu.ng:8080/jspui/handle/123456789/10362
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Dakas, Isa | - |
dc.contributor.author | Isa, R. B. | - |
dc.date.accessioned | 2021-07-18T10:47:34Z | - |
dc.date.available | 2021-07-18T10:47:34Z | - |
dc.date.issued | 2006 | - |
dc.identifier.citation | Dakas A. I. I. & Isa R. B. (2006). An Evaluation of Public Projects using Cost – Benefit Analysis (CPA). Case Study of Yakubu Gowon Dam and Rwang Pam Stadium in Plateau State, Journal of Environmental Science (JOES), 10(1), 139-145. | en_US |
dc.identifier.uri | http://repository.futminna.edu.ng:8080/jspui/handle/123456789/10362 | - |
dc.description.abstract | This study is aimed at carrying out Cost-Benefit Analysis (CBA) of public projects, as a basis of development programmes in Nigeria. The objectives are to determine the costs and benefits of public projects and evaluate the benefit/cost ratios, and some social impacts. Two public projects in Jos (Yakubu Gowon Dam, Shen and Rwang Pam Stadium) were studied. Data were collected from Plateau State Water Board and Plateau State Sports Council as well as through structured questionnaire and interviews. The period of study is 1998 to 2027. The analytical tools used included simple percentage (in the case of the social impacts; including migration, employment generation and standard of living) and Net Present Value (NPV) and Internal Rate of Return (IRR) in the case of economic costs and benefits of projects. The results showed the Yakubu Gowon Dam has N1, 880, 162, 000.00, 1. 68 and 8% NPV, Benefits/Costs ratio and IRR respectively and Rwang Pam Stadium has N86, 539,000.00, 1. 71 and 7% NPV Benefits/Costs ratio and IRR respectively. Also, the results of the analysis of the questionnaires show that public projects influence migration, employment and standard of living positively. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Journal of Environmental Science (JOES), | en_US |
dc.relation.ispartofseries | 10;1 | - |
dc.subject | Cost-benefit analysis | en_US |
dc.subject | Jos | en_US |
dc.subject | Public projects | en_US |
dc.subject | Social impact | en_US |
dc.title | An Evaluation of Public Projects using Cost – Benefit Analysis (CPA) | en_US |
dc.type | Article | en_US |
Appears in Collections: | Building |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
An Evaluation of Public Projects using Cost – Benefit Analysis (CPA). Case Study of Yakubu Gowon Dam and Rwang Pam Stadium in Plateau.pdf | Article | 4.89 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.