Title: A BIM-based framework for construction project scheduling risk management.
Authors: Abanda, F. H.
Musa, Musa Adamu
Clermont, P.
Tah, J. H. M.
Oti, A. H.
Keywords: BIM
Building Information Modelling
Construction projects
Risk
Synchro
Vico
4D/5D BIM
Bizagi
Scheduling software
Process model
Risk management software
Issue Date: Jan-2020
Citation: Abanda, F. H., Musa, A. M., Clermont, P., Tah, J. H. M., & Oti, A. H. (2020). A BIM-based framework for construction project scheduling risk management. International Journal of Computer Aided Engineering and Technology, 12(2), pp. 182-218..
Abstract: The management of risks has been at the heart of most construction projects. Building information modelling (BIM) provides opportunities to manage risks in construction projects. However, studies about the use of BIM in risk management are sketchy with a lack of a systematic approach in using BIM for managing risk in construction projects. Based on existing risk models, this study investigated and developed a BIM-based framework for the management of construction project scheduling risk. Although, the frameworks were developed by mining risk management processes from Synchro and Vico, both being amongst leading 4D/5D BIM software systems, they can inform risk management in BIM projects that are supported by 4D/5D BIM software systems that contain risk management modules. The frameworks were validated for their syntactic and semantic correctness.
URI: https://doi.org/10.1504/IJCAET.2020.105575
http://repository.futminna.edu.ng:8080/jspui/handle/123456789/12017
ISSN: 1757-2665
Appears in Collections:Project management Technology

Files in This Item:
File Description SizeFormat 
abanda2020 BIM based framework.pdfA BIM-based framework for construction project scheduling risk management.2.7 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.