Collection's Items (Sorted by Submit Date in Descending order): 21 to 40 of 50
Issue Date | Title | Author(s) |
2010-11 | DESIGN AND CONSTRUCTION OF A LIGHT SENSITIVE ALARM SYSTEM | ARE, MUSIBAU TAIWO |
2010-11 | DESIGN AND CONSTRUCTION OF AN ELECTROPLATING MACHINE | ADEDOYIN, ADEKUNLE O |
2009-12 | DESIGN AND CONSTRUCTION OF LONG RANGE FM TRANSMITTER | ZAKARI, ADAMU |
2011-11 | DESIGN AND CONSTRUCTION OF TWO LINE INTERCOM WITH A TELEPHONE CHANGE OVER SWITCH | A WODI, EMMANUEL AMEH |
2011-11 | DESIGN AND CONSTRUCTION OF A POWER CONTROL & UNDER-VOLTAGE DETECTOR | OJIH, OGHENENYORE |
2010-11 | DESIGN OF SKWJ THREE (3) PHASE SQUIRREL CAGE INDUCTION MOTOR | SUNDAY TOPE, ABEL |
2010-10 | DESIGN AND CONSTRUCTION OF " MOBILE PHONE SIGNAL JAMMER | OKEZIE, DAVID CHEKWE |
2010-11 | DESIGN AND CONSRUCTION OF AN AUTOMATIC VEHICLE HEAD LAMP SWITCHING CONTROL DEVICE | OBELE, BOLUWAJI JOEL |
2010-11 | DESIGN AND CONSTRUCTION OF REMOTE CONTROLLED SOCKET OUTLET | OBI, OKWUCHUKWU |
2010-11 | APPLICATION OF INFRARED RADAR SYSTEM FOR ACCIDENT PREVENTION | AMAKORUDOCHU, UJOHN |
2010-11 | DTMF (DUAL TONEMUL TI FREQUENCY) HOME POWER MANAGEMENT | OLUGBILE, ADEYEMI OLUTOSIN |
2010-11 | TRANSIENT ANAYLSIS AND MODELLING OF D.C SHUNT GENERATOR WITH INTERPOLES | SUNDAY, KELELCHI VINCENT |
2010-11 | DESIGN OF STREET LIGHT ARRANGEMENT FOR A ROAD OF 5KM USIr~G MERCURY VAPOUR LAMP WITH A MINIMUM ILLUMINANCE OF 15 LUX AT THE CENTRE OF THE ROAD AND 8 LUX AT THE ROAD KERBS. ALSO PROVIDE THE POWER SUPPLY NETWORK | ABUBAKAR, HUSSAINI SANI |
2010-11 | DESIGN AND CONSTRUCTION OF A MICROCONTROLLER BASED DIGITAL COUNTDOWN TIMER WITH ALARM | OJO, OLUWAFEMI TAYO |
2011-11 | DESIGN AND CONSTRUCTION OF A MICRO CONTROLLER BASE~ DIGITAL LOCK | DARE, SAMUEL EKUNDAYO |
2011-11 | DESIGN AND CONSTRUCTION OF AN AUTOMATIC CONTROL FOR SLIDE DOOR. | NWAGU, HENRY |
2010-10 | REAL-TIME MULTI-NODE DATA TRANSMISSION: DESIGNING A LOW LATENCY NETWORK TV | OGUNTADE, TEMITOPE .P. |
2010-11 | DESIGN AND CONSTRUCTION OF A . BATTERY-LOW VOLTAGE DETECTOR | OLOLADE AHMED, OYEBANJI |
2010-11 | RELIABILITY STUDY OF CIRCUIT BREAKERS (A CASE STUDY PHCN OSOGBO WORK CENTRE EQUIPMENT OFFICE) | ISELEWA, OLUWASEYI |
2010-11 | DESIGN AND CONSTRUCTION OF SIREN FOR AMBULANCE | ABDUL, SHADRACH |
Collection's Items (Sorted by Submit Date in Descending order): 21 to 40 of 50