Please use this identifier to cite or link to this item: http://ir.futminna.edu.ng:8080/jspui/handle/123456789/13900
Full metadata record
DC FieldValueLanguage
dc.contributor.authorOlubajo, Oluseun-
dc.contributor.authorIdoro, Godwin-
dc.contributor.authorJimoh, Richard-
dc.date.accessioned2021-10-12T10:50:53Z-
dc.date.available2021-10-12T10:50:53Z-
dc.date.issued2016-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/13900-
dc.description.abstractAll construction projects are unique and the amount of effort invested into planning activities will depend on the nature or the character of that project; as no two construction projects are identical. This prompted an investigation to evaluate the factors affecting the efforts invested into project planning activities at the pre-contract stage in Akwa Ibom state. The aim of the study is to evaluate the factors affecting efforts invested in project planning amongst selected consultants. A field survey involving 92 project consultants was adopted to achieve this objective. Data was collected using structured questionnaires and analysed using mean and relative importance index. It was discovered that the demands of the client, the clients budget and the construction method to be adopted ranked highest amongst others as having more impact on the measure of efforts invested in planning and indirectly on the performance of the construction Projects. The study suggests that all stakeholders collaborate more frequently by building stronger partnerships and aligning all actors as an integrated supply chain..en_US
dc.language.isoenen_US
dc.publisherSchool of Environmental Technology International Conference 2016, Federal University of Technology Minna,Niger State, Nigeriaen_US
dc.subjectProject lifecycle, Nigeria, Project planning, Pre-contract planning and planning effort.en_US
dc.titleFACTORS AFFECTING PROJECT PLANNING EFFORTS IN AKWA-IBOM STATEen_US
dc.typeArticleen_US
Appears in Collections:Building

Files in This Item:
File Description SizeFormat 
FACTORS AFFECTING PROJECT PLANNING EFFORTS IN AKWA-IBOM STATE.doc186.5 kBMicrosoft WordView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.