Please use this identifier to cite or link to this item:
http://ir.futminna.edu.ng:8080/jspui/handle/123456789/2185
Title: | Assessment of Drivers and Challenges of the Use of Cost Control Techniques in Dam Project Delivery in Nigeria. |
Authors: | 25. Madu, Nicholas Jimoh, Richard Shittu, Abdullateef Tsado, Theophilus |
Keywords: | Dam; Project Delivery; Driver; Challenge; Strategy; Nigeria |
Issue Date: | Dec-2019 |
Publisher: | Environmental Technology and Science Journal. School of Environmental Technology, Federal University of Technology, Minna, Nigeria. |
Citation: | Shittu, A. A., Mohammed, Y. D., Tsado, A. J. and Abu, B. R. (2019). Effect of Technological Advancement in Quantity Surveying on Cost, Labour and Time Performance of Construction Projects in Abuja. In R. A. Jimoh (Ed.): Environmental Technology and Science Journal. School of Environmental Technology, Federal University of Technology, Minna, Nigeria. December, 2019. Volume 10(2): 53-63. ISSN 2006-0459. |
Series/Report no.: | Volume 10;Number 2 |
Abstract: | A project is bound to fail due to its nature and size, that is, as projects increase in size, planning, budgeting and cost control become complex and problematic. This consequently leads to cost and time overruns that hinder effective project delivery. Ineffective application of cost control techniques from inception through to execution of infrastructural projects, especially dam projects, is a major cause of poor project delivery. This paper presents the result of pilot survey aimed at assessing the drivers and challenges of the use cost control techniques in dam project delivery in Nigeria with a view to suggesting strategies for improved delivery of dam projects. Questionnaire were sent to twenty (20) respondents purposively selected from the identified population for the larger study. Findings from the study indicated that technical know-how, the need to train people to implement cost control techniques and desire to complete the project within cost envelope were the major drivers in the use of cost control techniques. The size and technical requirement of the project, non-availability of skilled manpower, and the cost of applying the techniques were revealed as the major challenges the major challenges to the application of cost control techniques in the delivery of dam projects in Nigeria. It was however concluded that the most effective strategies for cost control techniques application for improved project delivery of dam projects are Bench-marking new projects to a reference class of similar completed projects (Reference class forecasting); enhanced project management capability; and Computer-aided cost estimating and forecasting models. Major recommendation from the study was that most severe challenges of cost control techniques application should be identified as a major threat to be addressed in order to mitigate the causes and effect of poor delivery of dam projects in Nigeria. |
Description: | Local Journal |
URI: | http://repository.futminna.edu.ng:8080/jspui/handle/123456789/2185 |
ISSN: | ISSN 2006-0459 |
Appears in Collections: | Quantity Surveying |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Shittu's Publication 25.pdf | 2.27 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.