Please use this identifier to cite or link to this item:
http://ir.futminna.edu.ng:8080/jspui/handle/123456789/27670
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Ganiyu, Bashir Olanrewaju | - |
dc.contributor.author | Eyong, Obenke P. | - |
dc.contributor.author | Ola-awo, Adeniran Wasiu | - |
dc.contributor.author | Oyewobi, Lukman O. | - |
dc.contributor.author | Jimoh, Richard. A | - |
dc.date.accessioned | 2024-04-30T09:22:25Z | - |
dc.date.available | 2024-04-30T09:22:25Z | - |
dc.date.issued | 2023-11 | - |
dc.identifier.citation | 18. Ganiyu, B.O., Eyong, O.P., Ola-awo, A.W., Oyewobi, L.O. and Jimoh, R.A. (2023). Contractors’ Tender-Related Risks Influence on Cost and Time Delivery of Construction Projects in Abuja, Nigeria. Environ Journal of Environmental Studies, 5(1), 82-103 | en_US |
dc.identifier.issn | 1110-457X | - |
dc.identifier.uri | http://repository.futminna.edu.ng:8080/jspui/handle/123456789/27670 | - |
dc.description.abstract | The construction industry is considered a high-risk sector owing to different factors such as the uniqueness and complexity of projects, diverse stakeholders’, and procurement systems. The study aimed to assess the influence of pre-contract tender-related risks on the post-contract performance of construction projects. A survey-based research design was adopted for data collection using a well-structured questionnaire administered to construction professionals in Abuja that were purposively selected. The data gathered from 102 respondents were analysed using descriptive statistics and paired sample T-test. The study found that two risk factors; ‘low contractor competence’ and ‘unforeseen site condition’ ranked among the top three important risks throughout both pre-contract post-contract stages. It was also discovered that although both pre- and post-contract risks have large effects on the cost and time performance of construction projects, contractors worry more about the cost of work at tendering stage. The three top-ranked strategies for minimising the effects of tender-related risks on construction projects' performance identified are: top management understanding of modern techniques and principles needed for efficient and effective tendering; effective and efficient documentation preparations; and studying project drawings by comparing specifications with actual conditions on site. Contractors’ most significant risks arise from the buildability of designs, level of quality (both at pre-contract stage) and effects of the deficiencies in the contractor’s own competence (at post-contract stage). Therefore, periodic training workshops on tendering risks management will help ensure that adverse effects of tender-related risks are minimized. | en_US |
dc.description.sponsorship | Joint efforts | en_US |
dc.language.iso | en | en_US |
dc.publisher | Faculty of Environmental Design, Ahmadu Bello University, Zaria Nigeria | en_US |
dc.relation.ispartofseries | 5(1); | - |
dc.subject | Contractors | en_US |
dc.subject | Cost | en_US |
dc.subject | Performance risks | en_US |
dc.subject | Pre-contract | en_US |
dc.subject | Tender related | en_US |
dc.title | CONTRACTORS’ TENDER-RELATED RISKS INFLUENCE ON COST AND TIME DELIVERY OF CONSTRUCTION PROJECTS IN ABUJA, NIGERIA | en_US |
dc.type | Article | en_US |
Appears in Collections: | Quantity Surveying |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Bashir JES 2023.pdf | 2.36 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.