Please use this identifier to cite or link to this item: http://ir.futminna.edu.ng:8080/jspui/handle/123456789/28657
Title: Causes and techniques for minimizing delay in completion of building projects by construction teams in Kano Metropolis
Authors: Sani, Y.
Kagara, A. B.
Idris, A. M.
Keywords: Causes
Techniques
Delay
Building Project
Construction Teams
Issue Date: 2021
Publisher: Bayero Journal of Science, Technology and Mathematics Education (BAJOSTME)
Citation: Sani, Y., Kagara, A. B., & Idris, A. M. (2021). Causes and techniques for minimizing delay in completion of building projects by construction teams in Kano Metropolis. Bayero Journal of Science, Technology and Mathematics Education (BAJOSTME), 2(2), 227-240
Abstract: The study determined the causes and techniques for minimizing delay in completion of building projects by construction teams in Kano Metropolis in Kano State, Nigeria. Three research questions and two null hypotheses were formulated to guide the study. Relevant literature in line with the objectives of the study was reviewed. Mean and standard deviation were used as statistical tools to analyze data for the research question, while ANOVA was employed to test the null hypotheses at 0.05 level of significance. Descriptive survey research design was employed for the study. The population for the comprised of 215 Clients of ongoing building projects, 71 Contractors and 71 Project Managers in Functional construction industries in Kano Metropolis, making a total of 357 respondents. The instrument used to collect data was questionnaire titled: Questionnaire for Techniques for Minimizing Delay in Completion of Building Projects by Construction Teams QTMDCBPCT) containing 46 items. The reliability coefficient of the instruments was found out to be 0.83 using Cronbach Alpha statistics. The findings of the study revealed that the shortage of construction material, inadequate consultant experience, incompetent project team, inadequate contractor experience and others are causes of building project delay in Kano Metropolis. Based on the findings of the study it was recommended that construction teams should develop adequately work productivity strategies in which extensive review of the causes of building delay be put into consideration before the commencement of building project in a be put into consideration before the commencement of building project in a view to avert delay.
URI: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/28657
ISSN: 2635-3105
Appears in Collections:Industrial and Technology Education

Files in This Item:
File Description SizeFormat 
Causes and Techniques for Minimizing Delay.pdf6.7 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.