Please use this identifier to cite or link to this item:
http://ir.futminna.edu.ng:8080/jspui/handle/123456789/28707
Title: | RELIABILITY-BASED MAINTENANCE QP ELECTRICAL BOWER DISTRIBUTION SYSTEMS: A PANACEA TO ERRATIC POWER SUPPLY IN ABUJA ELECTRICITY DISTRIBUTION COMPANY |
Authors: | Istifanus, K.K Raymond, E Owodunni, S.A Saba, T M |
Keywords: | Maintenance, Reliability-based Maintenance, Electrical Power Distribution, Power Supply. |
Issue Date: | 2022 |
Citation: | Istifanus K. Kalat; Raymond, E; Owodunni, S A and Saba, T M. (2022): RELIABILITY-BASED MAINTENANCE QP ELECTRICAL BOWER DISTRIBUTION SYSTEMS: A PANACEA TO ERRATIC POWER SUPPLY IN ABUJA ELECTRICITY |
Abstract: | This paper discusses maintenance and maintenance strategies with specific reference to Run-to-Failure maintenance; preventive (scheduled) maintenance; predictive (condition-based) maintenance. It also discussed the need for reliability-based maintenance as well as its intricacies reflecting on ita principles and potential questions. It enumerated the advantages of reliability-based maintenance which include among others: Rapid drop in maintenance cost; drop on downtime; better control on asset management and lifetime expectancy. It was recommended among others that: The strategic management of Electricity Distribution Companies should as a matter of urgency embrace and direct technical staff supervisors to adopt the tenets of reliability-based maintenance as the most efficient maintenance practice Management of Electricity Distribution Companies should organize capacity building for technical staff supervisors on the effective and efficient implementation of the reliability-based maintenance approach. |
URI: | http://repository.futminna.edu.ng:8080/jspui/handle/123456789/28707 |
Appears in Collections: | Industrial and Technology Education |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.