dc.description.abstractInvestigations that explore the knowledge, selection, and influence of milestone management practices on the performance of construction projects are limited. This study examined the dynamics involved in managing ambiguity and achieving set milestones in construction projects in Minna, Nigeria. Using the quantitative method, questionnaires (n = 150) were distributed to obtain data from construction professionals who adopted milestone management practices on their projects, of which 119 responded. This resulted in a remarkable 79% response rate, and high data reliability (0.962) was obtained. Notably, the findings underscore the pivotal role of specific milestone selection criteria in building construction projects as identified and ranked by the respondents. Scope of work (0.861) ranked first; schedule estimation (0.845) and quality assurance (0.845) ranked second; budget significance (0.844) and resource allocation (0.844) ranked third. Further findings show a significant relationship (i.e., p-value = 0.00) between the dynamics of milestone management and the performance of projects. The study accentuates the urgent need for appropriate selection and management of milestones for timely project completion in Nigeria. With this widely known practice, construction professionals would be able to represent and manage work activities and achieve set time expectations regardless of project disruptions.en_US
dc.language.isoenen_US
dc.publisher8th International Project and Construction Management Conference (IPCMC2024) Yildiz Technical University, Faculty of Civil Engineering, Department of Civil Engineering, İstanbul, Turkeyen_US
dc.subjectconstruction, milestones, planning, professionals, project, timeen_US
dc.titleManaging Ambiguity in Construction Projects in Nigeria:The Case for Selecting and Achieving Set Milestonesen_US
dc.typeArticleen_US
Appears in Collections:Building

Files in This Item:
File Description SizeFormat 
Olubajo, Akande and Daniel 2024 (1).pdf728.68 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.