Please use this identifier to cite or link to this item:
http://ir.futminna.edu.ng:8080/jspui/handle/123456789/3290
Title: | Application of Assignment Model in Optimizing Cost of a Building Project |
Authors: | Nyor, Ngutor Olaniyan Toyin Ladi Kevin |
Issue Date: | Dec-2015 |
Publisher: | Nigerian Journal of Mathematics and Applications |
Abstract: | The study sought to minimize the total cost of buildinga three bedroom Detached House in Minna. An Assignment problem was formulated and using Hungarian solution method, a realistic result was obtained. The sighting study with unpopular scenario in building recommended the sum of N3,885,000 which can be used to build a house of the type and specifications as provided in the study. |
URI: | http://repository.futminna.edu.ng:8080/jspui/handle/123456789/3290 |
Appears in Collections: | Mathematics |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
PAPER with Ladi, Assignment Model.pdf | 232.6 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.