Please use this identifier to cite or link to this item: http://ir.futminna.edu.ng:8080/jspui/handle/123456789/3290
Full metadata record
DC FieldValueLanguage
dc.contributor.authorNyor, Ngutor-
dc.contributor.authorOlaniyan Toyin-
dc.contributor.authorLadi Kevin-
dc.date.accessioned2021-06-15T16:32:12Z-
dc.date.available2021-06-15T16:32:12Z-
dc.date.issued2015-12-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/3290-
dc.description.abstractThe study sought to minimize the total cost of buildinga three bedroom Detached House in Minna. An Assignment problem was formulated and using Hungarian solution method, a realistic result was obtained. The sighting study with unpopular scenario in building recommended the sum of N3,885,000 which can be used to build a house of the type and specifications as provided in the study.en_US
dc.language.isoenen_US
dc.publisherNigerian Journal of Mathematics and Applicationsen_US
dc.titleApplication of Assignment Model in Optimizing Cost of a Building Projecten_US
dc.typeArticleen_US
Appears in Collections:Mathematics

Files in This Item:
File Description SizeFormat 
PAPER with Ladi, Assignment Model.pdf232.6 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.