Collection's Items (Sorted by Submit Date in Descending order): 161 to 180 of 395
Issue Date | Title | Author(s) |
2011-10 | Impact of Organizational Culture on the Occurrence of Rework in Building Project | Oyewobi, Luqman Oyekunle; Ibrahim, Ahmed Doko; Ganiyu, Bashir Olanrewaju; Okwori, Inalegwu G. |
2011-07 | IMPACT OF STRESS MANAGEMENT ON THE PRODUCTIVITY OF WORKERS ON NIGERIAN CONSTRUCTION SITES | Oyewobi, Luqman Oyekunle; Adamu, Anita D.; Ganiyu, Bashir Olanrewaju; Odelade, O.M |
2011-08 | Determinants of Unethical Performance in Nigerian Construction Industry | Oyewobi, Luqman Oyekunle; Ganiyu, Bashir Olanrewaju; Oke, Abdulganiyu Adebayo; Ola-awo, Wasiu Adeniran; Shittu, Abdullateef A. |
2011-06 | The effect of project types on the occurrence of rework in expanding economy | Oyewobi, Luqman Oyekunle; Oke, Abdulganiyu Adebayo; Ganiyu, Bashir Olanrewaju; Shittu, Abdullateef A.; Isa, Rasheed B.; Nwokobia, Lynda |
2011 | Evaluating rework cost- A study of selected building projects in Niger State, Nigeria | Oyewobi, Luqman Oyekunle; Ibironke, Timothy O.; Ganiyu, Bashir Olanrewaju; Ola-awo, Wasiu Adeniran |
2017-06 | A Bespoke Approach for Relating Material Waste to Cost Overrun in the Construction Industry | Saidu, Ibrahim; Shakantu, Winston M; Adamu, Anita Dzikwi; Anugwo, Iruka C |
2018-03-11 | The Potentiality of South African SMMEs Contractors Globalizing within the SADC Construction Market | Anugwo, I C; Saidu, I; Adamu, A D; Shakantu, W M |
2011 | IImpact of Stress Management on the Productivity of Workers on Nigerian Construction Sites | Oyewobi, Luqman O; Adamu, Anita Dzikwi; Ganiyu, Bashir O; Odelade, O Mark |
2016 | ) Strategic Maintenance Management of Built Facilities in an Organisation | Adamu, Anita Dzikwi; Shakantu, Winston M |
2016-06 | CONDITION ASSESSMENT OF STUDENT HOSTEL BUILDING ON CAMPUSES OF FEDERAL UNIVERSITIES IN NORTH-CENTRAL NIGERIA | Adamu, Anita Dzikwi; Shakantu, Winston M |
2016-06 | USER SATISFACTION WITH SPACE FLEXIBILITY IN OFFICES OF SELECTED TERTIARY INSTITUTIONS IN NIGER STATE, NIGERIA | Adedayo, Olatunde F.; Anunobi, Anthony I; Oyetola, Stephen A.; Adebayo, Oluwatoyin A.; Odine, Lynda, C. |
2020 | Assessing construction material manufacturers’ warehouse processes from a customer satisfaction perspective | - |
2018 | Demystifying the Effects of Final Accounts Settlement on Building Contractors in Abuja, Nigeria | Johnson, Abidoye; Saidu, Ibrahim; Adamu, Anita, D; Polycarp, Alumbugu, O. |
2019-12 | Determination of the critical success factors for attaining quality performance in partnering projects in Lagos and Abuja, Nigeria | Saidu, Ibrahim; Ola-Awo, Wasiu, A; Oke, Abdulganiyu, A |
2019-12 | Contributions of Contracting Parties to Non-Settlement of Final Accounts in Building Projects in Abuja, Nigeria | Yahaya, I.; Abidoye, J; Saidu, Ibrahim |
2018-06 | Assessment of the Cost Impacts of Health and Safety Practices on Construction Projects in Abuja, Nigeria | Sanni, Ottaru; Saidu, Ibrahim; Yakubu, Mohammed, D; Polycarp, Alumbugu, O. |
2018-06 | Appraisal of Challenges of Stakeholder’s Management in Construction Projects in Nigeria | Yahaya, M. B; Kasimu, M. A; Saidu, Ibrahim; Shittu, Abdullateef |
2019 | A conceptual framework for waste identification and reduction in Nigerian sandcrete blocks production process | Aka, Adefemi; Bamgbade, Abosede, B; Saidu, Ibrahim; Balogun, Oladimeji, M |
2015-01 | A Comparative Analysis of the Cost of Cash Retention and Retention Bond. | Ganiyu, Bashir Olanrewaju; Ola-awo, Wasiu Adeniran; Adetoro, Kabir; Umar, Moh’d Kabir |
2015-03 | Evaluation of Perception of Stakeholders on Key Performance Indicators for U.B.E Building Projects. Journal of Multidisciplinary Engineering Science and Technology, 2(3): 277-285 | Alumbugu, Polycarp Olaku; Saidu, Ibrahim; Abdulazeez, Abdulmumin; Ola-awo, Wasiu Adeniran; Tsado, Abel John |
Collection's Items (Sorted by Submit Date in Descending order): 161 to 180 of 395