Collection's Items (Sorted by Submit Date in Descending order): 181 to 200 of 395
Issue Date | Title | Author(s) |
2014 | An Analysis of Relationship between Working Height and Productivity of Masonry Workers on Site. | Alumbugu, Polycarp Olaku; Saidu, Ibrahim; Abdullahi, Sa’adu Gulma; Ola-awo, Wasiu Adeniran; Abdulazeez, Abdulmumin; Suleiman, Bolaji |
2015 | A Comparative Analysis of Methods of Procuring Plant and Equipment in execution of Construction Projects. | Alumbugu, Polycarp Olaku; Saidu, Ibrahim; Ola-awo, Wasiu Adeniran; Abdulmumin, Abdulazeez; Adedeji, Nike Shakirat |
2014-05 | Assessment of the Factors Affecting Accuracy of Pre-tender Cost Estimate in Kaduna State, Nigeria | Alumbugu, Polycarp Olaku; Ola-awo, Wasiu Adeniran; Saidu, Ibrahim; Abdullahi, Mustapha Muhammed; Abdulmumin, Abdulazeez |
2015-03 | Assessment of the effect of plan shapes on cost of institutional buildings in Nigeria. | Saidu, Ibrahim; Alumbugu, Polycarp Olaku; Abdulazeez, Abdulmumin; Ola-awo, Wasiu Adeniran |
2011-07 | IMPACT OF CORRUPTION ON EFFECTIVE PROJECT DELIVERY OF BUILDING PROJECTS IN ABUJA | Oyewobi, Lukman; Abdullahi, M. A; Nwokobia, Lynda, C. |
2011-08 | Determinants of Unethical Performance in Nigerian Construction Industry | Oyewobi, Luqman Oyekunle; Ganiyu, Bashir Olanrewaju; Oke, Abdulganiyu Adebayo; Ola-awo, Wasiu Adeniran; Shittu, Abdullateef Adewale |
2015-03 | Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in Nigeria | Saidu, Ibrahim; Alumbugu, Polycarp; Abdulmumin, Abdulazeez; Ola-Awo, Wasiu |
2011-03 | Evaluating rework cost- A study of selected building projects in Niger State, Nigeria | Oyewobi, Luqman Oyekunle; Ibironke, Olajide. T.; Ganiyu, Bashir Olanrewaju; Ola-awo, Wasiu Adeniran |
2018 | Potentiality of the South African Construction SMME Contractors Globalising within and Beyond the SADC Construction Markets | Anugwo, I. C; Winston, Shakantu; Saidu, Ibrahim; Adamu, Anita |
2017-03 | A Bespoke Approach for Relating Material Waste to Cost Overrun in the Construction Industry | Saidu, Ibrahim; Winston, Shakantu; Adamu, Anita, D.; Anugwo, I. C |
2016 | A Conceptual Framework and a Mathematical Equation For Managing Construction Material Waste and Cost Overruns | Saidu, Ibrahim; Winston, Shakantu |
2013 | Assessment of Cost Management Functions of Quantity Surveyors with Lean Methodology | Anifowose, Opeyemi Maroof; Ola-awo, Wasiu Adeniran; Mohammed, Tanimu U. |
2015-03 | Evaluation of Perception of Stakeholders on Key Performance Indicators for U.B.E Building Projects | Alumbugu, Polycarp; Ola-Awo, Wasiu; Saidu, Ibrahim; Abdulmumin, Abdulazeez; Tsado, Abel, J. |
2017 | A post-contract project analysis of material waste and cost overrun on construction sites in Abuja, Nigeria | Saidu, Ibrahim; Winston, Shakantu |
2017 | An investigation into cost overruns for ongoing building projects in Abuja, Nigeria | Saidu, Ibrahim; Winston, Shakantu |
2014 | An Analysis of Relationship between Working Height and Productivity of Masonry Workers on Site | Alumbugu, Polycarp; Saidu, Ibrahim; Abdullahi, SA'adu, G.; Ola-Awo, Wasiu; Abdulmumin, Abdulazeez; Bolaji, Suleiman |
2014-05 | Assessment of the Factors Affecting Accuracy of Pre-tender Cost Estimate in Kaduna State, Nigeria | Alumbugu, Polycarp, O.; Ola-Awo, Wasiu; Saidu, Ibrahim; Abdullahi, Mustapha, A.; Abdulmumin, Abdulazeez |
2021 | THE EFFECT OF POOR MATERIALS MANAGEMENT IN THE CONSTRUCTION INDUSTRY: A CASE STUDY OF ABUJA, NIGERIA | Albert, Idowu; Winston, Shakantu; Saidu, Ibrahim |
2016 | The contributions of construction material waste to project cost overruns in Abuja, Nigeria | Saidu, Ibrahim; Winston, Shakantu |
2021-06 | UTILISATION OF ORDER PROCESSING TECHNOLOGY FOR LOGISTICS PROCESS IMPROVEMENT IN THE NIGERIAN CONSTRUCTION INDUSTRY | Yahaya, Isah; Winston, Shakantu; Saidu, Ibrahim |
Collection's Items (Sorted by Submit Date in Descending order): 181 to 200 of 395