Please use this identifier to cite or link to this item: http://ir.futminna.edu.ng:8080/jspui/handle/123456789/6922
Full metadata record
DC FieldValueLanguage
dc.contributor.authorOnyedibe, V. O.-
dc.contributor.authorJimoh, O. D.-
dc.contributor.authorSaidu, Mohammed-
dc.date.accessioned2021-07-06T22:09:34Z-
dc.date.available2021-07-06T22:09:34Z-
dc.date.issued2016-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/6922-
dc.description.abstractIn this study, the hydropower potentials ofstreams in the Gidan Kwano area of the Federal University of Technology, Minna were assessed. The catchment has no stream gauging station. The flow characteristics of the catchment was determined using the flow records 2013 and 2014 from a neighbouring gauging station and discharge area ratio technique. lhe total estimated water yield is 6 million cubic metres. A development scheme for harnessing the water for hydropower and water supply was proposed. Reservoir analysis showed that 1500m3 ofwater per day can be releasedfrom Lunko reservoirfor power generation. This will generate 8.4 Kwhrfor a 4 hour period and provide water to 12,500 persons at consumption rate of 120 liter per capita per day. If these streams are properly harnessed using small hydropower technologies, they can go a long way in solving the waterproblem in the University as well as boosting the available power supply.en_US
dc.language.isoenen_US
dc.publisherNigerai Association of Hydrological Sciencesen_US
dc.subjectHydropower Potentialen_US
dc.subjectLunkoen_US
dc.subjectGidan Kwanoen_US
dc.titleAssessment of Potential of River Lunko, Gidan Kwano (Niger State) for Hydropower Generation and Domestic Water Supplyen_US
dc.typeArticleen_US
Appears in Collections:Civil Engineering

Files in This Item:
File Description SizeFormat 
Saidu 22.pdf4.51 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.