Please use this identifier to cite or link to this item:
http://ir.futminna.edu.ng:8080/jspui/handle/123456789/7261
Title: | A Conceptual Framework and a Mathematical Equation For Managing Construction Material Waste and Cost Overruns |
Authors: | Saidu, Ibrahim Winston, Shakantu |
Issue Date: | 2016 |
Publisher: | International Journal of Social, Behavioral, Educational, Economics, Business and Industrial Engineering |
Series/Report no.: | vol 10, No. 2;555-5612 |
URI: | http://repository.futminna.edu.ng:8080/jspui/handle/123456789/7261 |
Appears in Collections: | Quantity Surveying |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
My framework 2016.pdf | 439.62 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.