Please use this identifier to cite or link to this item:
http://ir.futminna.edu.ng:8080/jspui/handle/123456789/7657
Title: | Route re-alignment survey for cost effective construction of a connecting bridge over Suleja dam. Sustainable Built Environment and Climate Change; The Challenges of Post 2015 Development Agenda. School of Environmental Technology International Conference (SETIC 2016). Pages 161-170. |
Authors: | Ibrahim, O. P Mark, Z Isau, A. I Samaila-Ija, H. A Ajayi, Oluibukun Gbenga Nwadialor, I. J |
Keywords: | Route re-alignment Bridge construction Bathymetric survey |
Issue Date: | 2016 |
Publisher: | School of Environmental Technology International Conference (SETIC 2016) |
Abstract: | Before the construction of Suleja dam in 1993, people and goods were conveyed / transported freely through the old road because the small river separating the adjoining communities (Ija, sabo bwari, ija kuchiko and ija koro) had a small bridge that accommodated vehicular and other means of transportation. However, because of the construction of the dam, the communities once connected are now separated in their economic and social interaction. In view of this; this research was carried out with the aim of realigning the old road to accommodate a shorter and cost effective bridge over the dam. Differential Global Positioning System (DGPS) receivers were used to set-out the new alignment while an Automatic level was used to transfer height from the Benchmark to the lake. Eco Map 50s was used to carry out the strip sounding over the proposed bridge route to determine the water depth. A total length of 2.919km was obtained from the proposed realignment as against a distance of 3.038km of the old alignment. As a result, a proposed bridge length of about 514m was achieved as against the 740m of the old alignment. AutoCAD 2010 and Carlson were used to plot the alignment, as well as the longitudinal profile and length calculation. In addition Layer stacking of the existing alignment and new alignment of the area on satellite imagery of the site was also carried-out in order to depict the differences between the existing road and the proposed realignment. |
Description: | Ibrahim, O.P., Mark, Z, Isau, A.I., Samaila-ija, H.A., Ajayi, O.G. & Nwadialor, I.J. (2016). Route re-alignment survey for cost effective construction of a connecting bridge over Suleja dam. Sustainable Built Environment and Climate Change; The Challenges of Post 2015 Development Agenda. School of Environmental Technology International Conference (SETIC 2016). Pages 161-170. |
URI: | http://repository.futminna.edu.ng:8080/jspui/handle/123456789/7657 |
Appears in Collections: | Surveying & Geoinformatics |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Ibrahim P_et al SETIC2016.pdf | Ibrahim et al 2016-SETIC | 2.75 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.