Please use this identifier to cite or link to this item: http://ir.futminna.edu.ng:8080/jspui/handle/123456789/865
Full metadata record
DC FieldValueLanguage
dc.contributor.authorLawal, Sunday Albert-
dc.date.accessioned2021-06-02T21:45:28Z-
dc.date.available2021-06-02T21:45:28Z-
dc.date.issued2011-
dc.identifier.citation1en_US
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/865-
dc.description.abstractThis paper presents a Network Analysis of Maintenance Schedule of Hydropower Turbine of Jebba Hydropower Station Using Computer Software. The Performance and Management Department of the station is responsible for the scheduling of annual maintenance of turbine and its auxiliaries. This study examined the use of Power Angle (PA) software and compared it with Microsoft Office Project (MOP) software being used by the station. It was discovered that the MOSP presented the maintenance activities as arranged in table 1 without alteration, while PAS re-arranged the activities, thereby giving a more efficient order and better “Critical Path” for the maintenance activities in Jebba Hydropower Station. It was equally discovered that MOP software does not have the features to analyze the free, delay and slack for the maintenance activities, which are critical in planning and controlling of any maintenance activities or projecten_US
dc.language.isoenen_US
dc.publisherAnnals of Faculty of Engineering, Hunedoara, International Journal of Engineering,en_US
dc.relation.ispartofseries;Tome IX, Fascicule 3-
dc.subjectmaintenanceen_US
dc.subjectschedule,en_US
dc.subjectcritical path method,en_US
dc.subjectturbineen_US
dc.titleComputer Network Analysis of Maintenance Schedule of Hydropower Turbineen_US
dc.typeArticleen_US
Appears in Collections:Mechanical Engineering

Files in This Item:
File Description SizeFormat 
Maintenance Computer.pdf626.63 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.