Title: Labour Management Practices of Construction Contractors in Kainji/New Bussa Area of Niger State, North-Central Nigeria
Authors: Makinde, Joseph Kolawole
Oke, Abdulganiyu A
Issue Date: Jun-2009
Publisher: Journal of Environmental Sciences. Faculty of Environmental Sciences, University of Jos
Series/Report no.: Vol. 13;No. 1, P. 91-97
Abstract: This paper enumerated the number of facilities provided for construction labour by contractors with the study area. In addition to describing the relationships between contractors turnover of projects and the (I) number of facilities provided by contractors, (ii) frequency of dismissals of construction labour, and (iii) frequency of disputes on construction sites. Ten research questionnaires, which comprised eleven (11) simple multi-choice questions on various aspects of labour management on construction sites, were administered to contractors/site agents selected for the study. Seven questionnaires were returned, giving a return rate of 70%. The majority of firms sampled engaged in both building and civil engineering works. The highest number of workers retained on site by contractors was sixteen. No skilled worker was paid more than #1700.00 per day. Unskilled labour earned between #500.00 and #700.00. Interviews with the site management revealed that daywork was widely practiced (workers paid daily for work performed). Other sites practiced piecework (where a gang of workers was paid a lump sum for a piece of work successively completed). Neither the provision of site facilities nor the number of workers dismissed from construction sites was related to the project turnover of contractors. Site disputes were not as constant as suggested by correlation analysis of the research data, only about one in twelve projects (8%) involved labour disputes. Conclusions were drawn that construction clients need to do more to encourage smaller contractors provide basic site facilities for their workers as well as suitable forum on site where grievances of workmen could be expressed. This could take the form of an informal gathering once a week where the views of everybody could be heard.
URI: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/9031
ISSN: 1118-8936
Appears in Collections:Project management Technology



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.