Please use this identifier to cite or link to this item: http://ir.futminna.edu.ng:8080/jspui/handle/123456789/9963
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAlumbugu, Polycarp Olaku-
dc.contributor.authorOla-Awo, Wasiu-
dc.contributor.authorSaidu, Ibrahim-
dc.contributor.authorAbdullahi, Mustapha-
dc.contributor.authorAbdulmumin, Abdulazeez-
dc.date.accessioned2021-07-16T13:53:54Z-
dc.date.available2021-07-16T13:53:54Z-
dc.date.issued2014-05-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/9963-
dc.description.abstractAccurate cost estimates are crucial to the effective realisation of construction projects. Researchers have noticed the presence of inherent inaccuracies in the bill of quantities prepared by estimators (Quantity surveyors). This paper aimed at examining the factors affecting accuracy of pre-tender cost estimate in Kaduna state, with a view to improving the predictive ability of clients, consultants, and contractors for better estimating. A total of 66 questionnaires were administered with 35 to consultants (53.03%), 15 to contractors (22.73%) and 16 (24.24%) to clients within Kaduna using the simple random sampling technique. The collected data were analysed using the Relative Importance Index and correlation analysis. The study found out that a statistically significant relationship existed between the clients, consultants, and contractor on the essential factors affecting accuracy of pre-tender cost estimate. It was concluded that: Experience and skill level of the consultants, Project teams experience on the construction type, clear and detail drawings and specification, completeness of cost information, accuracy and reliability of cost information are the most significant factors affecting accuracy of pre-tender cost estimate. It was recommended that Clients should always engage the services of skilled professionals to undertake the consultancy services in cost estimating process.en_US
dc.language.isoenen_US
dc.publisherIOSR Journal of Environmental Science, Toxicology and Food Technology (IOSR-JESTFT)en_US
dc.relation.ispartofseriesVolume 8, Issue 5;PP 19-27-
dc.subjectKey words: Accuracy- estimation, Pre- tender and Cost estimate.en_US
dc.titleAssessment of the Factors Affecting Accuracy of Pre-tender Cost Estimate in Kaduna State, Nigeriaen_US
dc.typeArticleen_US
Appears in Collections:Quantity Surveying

Files in This Item:
File Description SizeFormat 
a2b40d7ac43fb8014afe79d590f134c0ead0.pdf242.22 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.